Product Detail :
|
Renovation of service building & repair of colony road of barkakana under asstt. engineer, e.c. rly, barkakana 06 (six) months. Provision of side pathway in steel girder bridges of bridge no.32, 42, 81149 (rub), 200(rub), 206 and 229 under sse (bridge in kqr-brka section in division. 09 (nine) months. Regarding of bridge no. 416 (up&dn line), span (1x9.15+1x12.2+1x9.15) between bnf-tkn station at km 455/28-456/1 under sse (bridge) in dhn division. 11 (eleven) month. Provision of side pathway in steel girder bridges of bridge no. 110dn, 120dn, 133dn, 1560n, 1560n 162on. 188dn, 1940n, 210dn, 2180n, 248dn, 251dn, 269dn, 2970n, 311dn and 7 under see (bridge)ohn in brka-ghd section and siding line section of division 09 (nine) months. Changing of rusted corroded and perforated member of br. no. 11 (1x12.20+8x18.30+1x12.20m) between jnn- crp station under sse (bridge)dhn in dhn-crp section of e.c. railway division. 11 (eleven) months. Changing corroded/rusted cracked of top flange plate, bottom main angle, gusse plate, lateral bracing strengthening of cross girder, provision of protection screen and changing of loose rivets of bridge no.7, 31, 35 & 44 in cpu-sktn section under sse/brdto in dhn division. 08 (eight) month. Improvement of platform surface, pf shed and coping of koderma station under asstt. engineer, e.c. rly., gujhandi. 06 (six) months. Provision of pipe laying from intake well at tilaiya dam to koderma railway station under asstt. engineer, e.c. rly., gujhandi. 06 (six) months. Repair of hzd goods siding road at hzd station under asstt. engineer, e.c. rly, gujhandi. 04 (four) month. Construction of running room at hzbn under aden/kor. 11 (eleven) month. Improvement of pipradih and charhi station building, circulating area and boundary wall of staff quarter under aden/kor. 07 (eleven) month. Construction of pucca approach road surface at new giridig (ngrh) and salaiya (slia) under aden/kor. 06 (six) month. Development of children park at hzbn under adenkor. Improvement of kuju yard its drainage, circulating area, road, station building etc. under adenkor. 08 (eight) months. Fixing boundary pillar in the section koderma-giridih under adenkor, e.c. railway. 06 (six) months. Construction of pwi office, stores & quarters, fixing boundary pillar, drain cleaning etc in the section kqr-mmd under aden/kor. 12 (twelvo) month. Provision of retro reflective signages from pipradih to arigada of low height cess in the section of koderma arigada under aden/kor. 03 (three) month. Improvement of staff quarter kitchen and toilet at hzbn, ksh, kkas, kaga, bhri, bes, chri, padyh, pdma (total 64 no.) & improvement of water supply at hzbn station. 06 (six) month. Improvement of running room and service building at hzbn, provision of boundary wall, improvement of floor surface by tiles etc. 06 (six) month.
|